For Volume Home Builders & Developers

Stop waiting on LADWP.
Start building faster.

You manage the vertical construction. We manage the bureaucracy. Offload your entire dry utility portfolio—SCE, LADWP, SoCalGas—to a team that guarantees energization timelines.

Navigating the complexities of California's toughest agencies

LADWP SCE SoCalGas AT&T SPECTRUM

The Old Way

  • Project Managers wasting hours on hold with city planners.
  • Surprise redesigns because of missed Rule 20 constraints.
  • Houses finished, but sitting empty waiting for meters.
  • Juggling 5 different expeditors across 10 active builds.

The Decision Way

  • A dedicated team that handles 100% of dry utility routing.
  • Proactive clash detection before you ever break ground.
  • Guaranteed meter spot alignment and final energization.
  • One dashboard to track every permit across your entire portfolio.

Complete Dry Utility Takeover

We don't just file paperwork. We engineer the routes, coordinate the agencies, and secure the clearances.

Electrical Infrastructure

Turnkey management of SCE & LADWP design. We handle vault, pad, and pull-box siting to ensure seamless energization.

  • Design Management
  • Meter Spotting

Natural Gas Networks

Direct coordination with SoCalGas for main extensions, high-pressure line routing, and complex commercial manifold designs.

  • Main Extensions
  • Cut, Cap & Abandonment

Telecom & Joint-Trench

Consolidate your footprint. We design joint-trench systems and manage clearances for AT&T, Spectrum, and fiber providers.

  • Joint-Pole Clearances
  • Rule 20 Undergrounding
Built for Volume

Track 50 projects.
Without opening an email.

Stop digging through confusing email chains from city planners. Our proprietary client portal gives your PMs real-time visibility into every application, GIS coordination, and meter set across your entire development portfolio.

GIS Route Mapping Live view of subsurface joint-trench designs.
Agency SLA Tracking Monitor days-in-review against agency mandates.
Search Tract or APN...
API Sync Live
PM

Portfolio Command Center

42 Active Sites | 14 Pending Agency Action

Tract 492 • Joint Trench Overlay
12kV Primary
Agency Alerts 2 Critical
LADWP Plan Check Rejected 14m ago
Clearance issue at Vault 4. Redesign required for Rule 20 compliance.
SCE Design Pending 2h ago
Tract 881: Approaching SLA limit (45 days) for initial design return.
SoCalGas Will-Serve Issued Yesterday
Document automatically filed to Project Hub.
Critical Path Timelines
Project Alpha - Beverly Hills
LADWP Temp Power & Main Line
READY TO PULL
Intake Design Plan Check RTI
Tract 492 - Santa Monica
SCE Rule 15 Design
IN REVIEW (DAY 14)
Intake Design Plan Check RTI
JS

Field Inspector

Tract 492 • Trenching Phase

Mandatory Checks 1 of 3
Verify trench depth (48")
Photograph conduit separation
Capture warning tape placement
Tap to Scan & Upload Image

Let's look at your active roster.

Stop letting utility delays dictate your build schedule. Schedule a 15-minute strategy call, and we'll show you exactly how we can compress your dry utility timeline.